图片展示

English
  • 中文
  • English
English
  • Chinese
  • English

Products

Pool China’s wisdom and strength into global development

 

产品中心

立足佛山 基因纯粹 品质保证

 


Project of Greenverse Environmental Tech Integrated Scheduled Waste Treatment Plant

It is settled on the east coast of Malaysia and covers an area of 50 acres, with the planned overall capacity of 500,000 tons per year and a total investment of about MYR250 million, becoming the first waste treatment plant in the field of scheduled waste management on the East Coast and throughout Malaysia.

产品详情

Project of Greenverse Environmental Tech Integrated Scheduled Waste Treatment Plant
It is settled on the east coast of Malaysia and covers an area of 50 acres, with the planned overall capacity of 500,000 tons per year and a total investment of about MYR250 million, becoming the first waste treatment plant in the field of scheduled waste management on the East Coast and throughout Malaysia.
Long press to look detail
Long by picture save/share

National service hotline:

 

+86-022-66224855/66224859

Contact address:

 

TEDA MSD-G2-F15, No. 57 Second Avenue, Binhai New Area, Tianjin

 


Copyright © 2023 All Rights Reserved 京ICP备09074256号-2

添加微信好友,详细了解产品
使用企业微信
“扫一扫”加入群聊
复制成功
添加微信好友,详细了解产品
我知道了